Guide — Deemed export

A pre-access checklist your compliance team can actually run.

Use this checklist to evaluate whether your current visitor or contractor process meets deemed-export expectations — or whether you need a dedicated pre-access decision system.

  • Scope capture
  • Screening gate
  • Evidence export
Deemed export access control checklist workflow

Decision before access

Intake, screening, review, approval gate, and evidence export stay on one record.

Checklist

Before you grant controlled access

  1. 01Identify the subject, citizenship, and employer before scheduling site access.
  2. 02Define the access scope: areas, data classification ceiling, time window, and escort requirements.
  3. 03Confirm an internal host or sponsor accountable for the visit.
  4. 04Run denied-party / export-control screening before approval, not at the lobby.
  5. 05Route potential matches to a trained reviewer with match-resolution codes.
  6. 06Block self-review: the requester cannot be the final approver on their own case.
  7. 07Record approve, deny, or conditional outcomes with structured reason codes.
  8. 08Retain an exportable evidence pack tied to the case ID — not an email thread.
  9. 09Re-screen active approvals when lists change or the visit window extends.

Regulated Access implements items 4–8 as product workflow — intake, screening gate, review console, self-review block, and evidence pack export. Items 1–3 and 9 are operational practices the product supports through host/site admin, scope capture, and re-screening foundation.